Schofields Railway Station Substation

Schofields Railway Station Substation Case Study

The contractor used 300m2 of Fosroc Proofex Engage to waterproof the substation floor slabs, upturns, and the top of pile caps. The unique mesh design of Fosroc Proofex Engage gives a permanent tenacious mechanical bond to freshly-placed concrete.

Proofex Engage

Proofex Protection Board PP

Coal Terminal Rail Upgrade

Coal Terminal Rail Upgrade Case Study

In sections, each ship coal-loader rail was raised and relevelled. Some rail lines required temporary under-pinning with high performance cementitious Conbextra HS grout, before final installation of pad style supports using ultra high strength epoxy Conbextra EP65 Plus grout.

Conbextra HS

Conbextra EP65 Plus

IKEA Marsden Park

Ikea Marsden Park Case Study

Nitoflor SL self smoothing epoxy floor topping was the ideal solution for this project, meeting the project requirements and addressing all site specific issues.

Nitomortar 903

The Market Place Lidcombe

The Market Place with Fosroc Proofex Engage and Fosroc Proofex Engage Accessories

Fosroc Proofex Engage was the ideal solution for this project, meeting the project requirements and addressing all site specific issues.

Proofex Engage

Endeavour Bridge

Endeavour Bridge Case Study

640m2 of concrete was repaired using a combination of Renderoc HB40 and Renderoc LA55. To provide the desired finish the external concrete surfaces of the bridge, including the patch repairs, were covered with Renderoc FC. 

Renderoc HB40

Renderoc LA55

Vector Galvashield XP

Dekguard S

Bendigo Toyota Case Study

Bendigo Toyota Fosroc case study

Nitoflor FC150 HP, Nitomortar 903 & Nitomortar F4 Fillers were selected as the best flooring coating system to meet Bendigo Toyota's requirements: a floor that can cope with chemical attack, mechanic toolbox transfers, vehicle traffic and ease of cleaning of spills. 

Nitomortar 903

Nitomortar F4 Fillers