Cape Naturaliste Lighthouse

Cape Naturaliste Lighthouse in South West WA is exposed to the elements in a highly corrosive environment.  Fosroc ANZ provided a comprehensive concrete repair system for the entire building inside and out, and a non-slip waterproofing solution fo...

Embassy Floors

At one of Canberra's diplomatic embassies, 30 years of wear and tear had left the basement and plant room floors in urgent need of repair. The busy floors needed a tough coating solution with a non-slip surface.

Newcrest Mining Bund Remedial Works

At one of the largest gold mines in Australia, acid used in the elution process had led to significant concrete erosion and steel corrosion.  Fosroc's specification delivered a comprehensive repair with multiple layers of long-term protection built in, for both steel and concrete.

Kirribilli Harbourside Carpark

Over 24,000 litres of Fosroc Renderoc HB40 Plus provided a concrete remediation solution to revitalise this carpark and ensure its safety for drivers and vehicles for years to come. To complete the solution, Dekguard S was applied over the entire soffit area for corrosion protection and Nitoproof 510 was used on the...

6 & 8 Parramatta Square

Fosroc Polyurea WHE110 was selected to waterproof a vast public domain area in front of 6 & 8 Parramatta Square in Sydney, NSW.  With a basement carpark underneath, the concrete needed tough long-term protection.

Parramatta Aquatic Centre

Superior waterproofing protection was required for the roof and plant room floors at the new Parramatta Aquatic Centre, which is due for completion in 2023.  Polyurea WHE110 was used for waterproofing, and Nitoflor PA topcoat provided a tough industrial finish.